The train will have six carriages, each 140 meters long. When full, it will have a capacity of 1,896.
The 33.57-kilometer line, designed for trains running at up to 80 km per hour, links 25 stops between Hubei University of Traditional Chinese Medicine and the East Square of Wuhan Railway Station.
The subway line includes 7.92 km of elevated line with four stops and 27.209 km of underground line with 21 stops.
Although there has been no official opening time, the subway line is expected to ease traffic congestion, meet demands for a better travel experience and accelerate regional economic development.
Invest in China Copyright © 2024 China Daily All rights Reserved
京ICP备13028878号-6
京公网安备 11010502032503号